Steel ball riveting.
Solenoid valve press fitting.
Piston assembly and circlip installation.
ECU (Electronic Control Unit) assembly.
Helium leak testing.
End-of-line (EOL) testing.
NVH (Noise, Vibration, Harshness) testing.
Production line cycle time: < 45 seconds.
Overall Equipment Effectiveness (OEE): > 85%.