Steel ball riveting.
Rubber cup assembly.
Pressure sensor & PTS press fitting.
Motor & MPS installation.
MPS & PTS calibration.
Simulator assembly.
High-pressure testing.
End-of-line (EOL) testing.
NVH (Noise, Vibration, Harshness) testing.
Production line cycle time: < 53 seconds.
Overall Equipment Effectiveness (OEE): > 85%.