Agent Side Panel + Water Side Panel Assembly.
Water Pump Assembly.
Water Valve Assembly.
Screw Tightening.
3D Inspection.
EXV/SOV/CV Assembly.
End-of-Line Testing.
Overall Line Cycle Time < 65s.
OEE > 85%.
Cycle Time 60s.
Please select the solution you are interested in